CVP factory – Capacity Improvement Project

The existing machineries at CVP factory have been improved and modified to increase the milling capacity from 60 TFFB/hr to 70 TFFB/hr in the peak crop period. Modifications were made to control the flow of FFB following the sterilization process, which allows for a faster turnaround time for loading the sterilizer. A faster turnaround provides for an increased number of cycles per day. This additional capacity allows Univanich to maximize throughput during peak cropping periods.